Lot for Lot Pegging
Summary: Does Fusion Supply Planning allow for 'Lot for Lot Pegging'?
Content (required):
In EBS ASCP we had a feature called 'Lot for Lot' that we could set at Plan Options which would force the creation of a separate supply for each demand. This prevented the creation of aggregate supplies that satisfy multiple demands. How can I achieve the same in Fusion Supply Planning?
Version (include the version you are using, if applicable):
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
0