Can you see the derivation of lead time for scheduled ship date
Summary: Often times we have scheduled ship dates which reflect over stating of lead times for manufactured items. We dig into item planning parameters and vendor lead times but it would be beneficial to see what elements are contributing to an item's lead time. This would greatly assist with troubleshooting. Is this possible?
Content (required):
Version (include the version you are using, if applicable):
22C
Code Snippet (add any code snippets that support your topic, if applicable):
0