GOP ignores sourcing rule if ship method on it is different from what is in manage transit lead time
Summary
GOP ignores sourcing rule if ship method on it is different from what is in manage transit lead times
Content (required):
We have transfer sourcing rules between orgs O1 and O2/O3.
O1 Transfers to O2 and also Transfers to O3 and in manage lead times we have setup a transit lead times from O1 to O2 and from O1 to O3 but the ship methods against which these are setup are different O1 to O2 uses SM1 and O1 to O3 uses SM2 as the ship methods.
We have one transfer sourcing rule(SR) created for O2 and O3 to transfer from O1 and the ship method on the sourcing rule is SM1
Tagged:
0