How does GOP determines SSD for ATO item with Supply Chain Availability Search mode?
Summary:
Content (required):
We have an ATO item with ATO item specifications:
ATP Components: Material Only
Check ATP: Material
Below is the item structure: All the items c=have check ATP set to material only.
Below is the supply availability of components:
Item A:1 On hand available
Item A2: PO Delivery scheduled on Day 5
Item A3: No onhand or incoming supplies
In that above circumstances will the GOP suggest Schedule Ship Date on Day 15, if the order is placed on Day 0?
Version (include the version you are using, if applicable):
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
0