End-to-End Trace Allocation for Multi-stage allocation in EPCM
Summary:
We have a requirement to do multi-stage cost allocation and end-to-end trace allocation.
I.e., If we do 4 stages of allocation, after the 4th stage of allocation, is it possible to see the percentage of allocated numbers from the 1st Step in the final combination?
I understand it was possible in HPCM Standard Profitability. Is it possible in EPCM?
Content (required):
Ex.
We have 5 business dimensions i.e., Dimension A (members S1, S2, S3, S4), Dimension B (Serv1), Dimension C (I1, I2), Dimension D (P1, P2), and Dimension E (E1, E2, E3).
I am doing 4 stage cost allocation as per the attached diagram. After executing rule #6, I will have allocated cost figures by
Tagged:
0