How can I set a default startdate (parameter) in GPI for submitting the extract/flow?

Summary:

creating a default startdate

Content (required):

Is there a possibility to set a default for the date (first day of the current year) in parameters GPI for submitting the extract? I can set 2023-01-01 but that is only working if your date preference has the same layout.

Version (include the version you are using, if applicable):

GPI V2.0

Code Snippet (add any code snippets that support your topic, if applicable):