We have requirement to verify the supply plan output if planned orders are generated correct based on Raw Material usage quantity from structure.

Example: Raw material Usage quantity in Structure 500 Gram, Raw material demand 450 KG.

Is it possible to analyze the supply plan output of the planned order which is generated perfectly based on the structure usage?

Content (required):

We have requirement to verify the supply plan output if planned orders are generated correct based on Raw Material usage quantity from structure.

Example: Raw material Usage quantity in Structure 500 Gram, Raw material demand 450 KG.

Is it possible to analyze the supply plan output of the planned order which is generated perfectly based on the structure usage?