The Maintenance program is not creating forecast as expected
Summary:
Hello,
We are generating Maintenance forecase via Maintenance program. in which we have kept maintenance work requirement on the Item level and all the assets under the same is been considered. And all the assets is having the same meter been associated but the reading is different as per the day to day running. Now as per the calculation of the daily basis 2 of the assets have to be considered by the forecast calender instead the system is only considering 1 of the assets for the planned maintenance.
Content (required):
As per the above point we have attached a complete scenario for your reference.