Can you please advise why a update to project code trigger emails for performance documents
Summary:
Hi Team,
A project costing change triggered a transfer of a performance document (it didn’t do a transfer, just triggered the alerts).
The notifications were triggered when changes were made by payroll.
Is there a way for changes made by payroll to trigger an option to send a notification?
eg: Person A's reporting line was with B , and when we made a change to A's position number for costing, it triggered the notification saying that A's performance document has been changed to C
Please advise
Thanks,
Asha Jennifer
Content (required):
Version (include the version you are using, if applicable):
Tagged:
0