We have created a Maintenance Management report that calculates the operating time ( latest meter reading - first meter reading) of assets within an organization. However, we encountered an issue when Asset A was transferred from Organization X to Organization Y. In the attached document, you'll notice that Asset GN-01 was initially located in 22105_100009, and its operating time was recorded as 10. However, after the asset was moved from 22105_100009 to 22105_900004, the operating time started showing up in 22105_900004 instead of 22105_100009. Could you please provide guidance on how to accurately track the operating hours of an asset within an organization after multiple relocations?"