How to skip the manager level one for worksheet plan allocations?

Summary:

The requirements is that the manager level one will not be able to do any allocation in the plan but will still be included in the plan. Only the manager level two and above will be allowed to do allocations in the worksheet plan. How can this be possible?

Thank you in advance.