Bundling Rules Min/Max duration of activities in a visit
Summary:
Hi Team,
We have a requirement to route the activities based on a custom property "location code" and we have enabled the bundling with this field and we set the min/max duration of activities in a visit range to "50%".
Our expectation is we have 10 activities with a duration of 30 mins, with same "location code" so as expected all of them got bundled and assigned to same technician, but as we set "min/max duration of activities in a visit" range to "50%", we expect first activity routed will take 100% duration so it would be 30 mins, but rest of 9 should be 15 mins as 50% of 30 mins. But only travel time is 0 for 9 activities but duration is not reduced.
Tagged: