What is the setup required for items used in the OSP flow to run WITH FULL LOT CONTROL?
The business needs to have traceability of the lots with which it is working
They need to know the lot number of the finished product and its respective components
But the tests I have done only work with no lot control
Thanks!
Tagged:
0