can we delete a new load plan from the ODI console and synchronize BIACM with the old load plan?
in Big Data
More Details: We are facing an issue in BIACM where the "Generate" button was clicked by mistake, causing the generation process to be stuck and showing an "in progress" status. This has disabled the execute button by default. We want to resolve this issue without regenerating a new load plan, as it may result in losing customizations and requiring a lot of rework. Is there a way to solve this issue without losing the original load plan?
Tagged:
0