How To Prevent Production Gaps In Production Scheduling?
Summary:
The system currently tries to schedule WOs to meet SOs, but sometimes leaves gaps between them.
A continuous production flow is needed.
Content (please ensure you mask any confidential information):
Our customer have the requirement to produce all the WOs as soon as possible.
Right now, Production Scheduling arrange the WOs to finish in time to respect the "Request Ship Date" in SOs, but our Customer wants Production Scheduling suggestions to be as soon as possible.
There is any way to accomplish this?
Version (include the version you are using, if applicable):
24D