How does OFSC determine Work Zone assignment when using GIS Shape File
Hi Everyone,
I am working on Work Zone determination using a GIS Shape file in Oracle Field Service Cloud and need some clarification on how OFSC assigns activities to the correct Work Zone.
Here is what I have configured:
- I uploaded a WorkZone Layer on the Business Rules → Work Zone Layer page.
- Used SRID = 2279.
- Set ShapeIdentifier = ID1 in the layer.
- Added the same value of ID1 under Configuration → Work Zones → Work Zone Shapes.
My question is:
How does OFSC determine that an activity belongs to a particular Work Zone when using GIS-based shapes?
- Does OFSC automatically use the activity’s coordinates to evaluate which polygon (shape) it falls into?
Tagged:
0