Redwood: Manage Cost Lists 25D
in Pricing
I tested the new Redwood cost list feature introduced in 25D.
I created a cost list, retrieved the cost for one item, and added a 10% markup. The final price inside the cost list was calculated correctly (item cost + 10%).
After that, I added this cost list to a pricing strategy and linked the strategy to a customer. When I tried to create a sales order using this pricing strategy, the order was linked correctly; however, when I added the item, the price was empty and no price was derived.
I would like to confirm whether I am missing any setup steps. So far, I have only created the cost list and added it to the pricing strategy.
Tagged:
0