Manual demand not showing in material plan
Hi we have constrained supply plan without forecast.
I tried to create manual demand for some items and attached the demand to simulation set and then run the plan with do not refresh with current data and refresh with current data.
Now we can see the demand for the particular item in material plan table. And then i tried to change the qty of the demand in supplies and demands table and simulation set, correct me but apparently we cannot change the qty of manual demand in simulation set.
In material plan the "manual demand" measure in not showing when I tried to use simulation set and not using simulation set.
0