Why calendar from file FBDI always getting erased in supply planning with source system OPS
Calendar from file FBDI in supply planning are getting erased with source system OPS
Hi
We have supply planning with source system OPS, we want to make the time level to have week dimension (day - week -period) hence using FBDI to import calendar
with the same source system (OPS). We have uploaded the calendar successfully in plan input and ran the supply planning, we run collection daily using net change for every entities (complete refresh) so that the calendar uploaded will not getting delete in plan inputs.
It's been second time that the calendar is getting erased in plan inputs. Any ideas why ?