Manufacturing WO Completed with Zero Cost - Rate-Based PO Not Included in Cost Rollup

Summary:

We are observing an issue with Mfg Work Order (WO) costing when using a rate-based Purchase Order (PO) for operation cost.

Scenario

  • Created a Manufacturing Work Order with 1 operation
  • No material items or additional resources were added to the WO
  • rate-based PO was created and associated with the operation

Expectation

  • The system should consider the rate-based PO cost
  • Cost should be rolled up to the WO
  • mfg WO should be fully costed
  • Appropriate cost accounting entries should be created

Actual Result

  • After completing the Work Order:
    • WO costing shows 0 cost
    • Rate-based PO is not picked up to calculate total item cost