How to create journal approval rules to allow journal batch to be approved as a single approval
We want to create journals for future enterable periods across multiple accounting periods; however, the current approval process requires each journal period to be approved separately. We would like the ability to obtain a single approval for the entire journal batch, with that approval applying to all journals within the batch, rather than requiring a separate approval for each period. Does anyone know if this is possible through the BPM rules or have another ideas on how to achieve this. Thanks
Tagged:
0