FMS 8.8 to 9.0 upgrade nVision error
We are upgrading from FMS 8.8 to 9.0 and PT 8.44 to 8.49. In testing nVision 3-tier reports and report books. When running the reports individually, we get the message "Process Request shows status of 'INITIATED' or
'PROCESSING' but no longer running" The log is empty and the trace has contains the following:
PeopleTools 8.49.28 Client Trace - 2010-12-01
PID-Line Time Elapsed Trace Data...
-------- -------- ---------- -------------------->
1-1 10.21.36 Tuxedo session opened {oprid='PSBATCH', appname='TwoTier', addr='//TwoTier:7000', open at 024DF750, pid=3944}
1-2 10.21.36 0.004000 Cache Directory being used: C:\psft\PT849\appserv\prcs\FPTST90\CACHE\FPTST90\1\
1-3 10.21.38 2.430000 Tuxedo session opened { DisconnectAll at024DF750, pid=3944
0