Applying Maintenance Packs
We are applying MP7 through MP9 delta in demo and then want to have the changes in other environments.
It takes a long time to run these MPs through the change asst.
I know it is possible to apply the MPs on all the environments one by one.
Have anyone tried migrating the master project of the MPs from DEV to TST and production and running the DMS scripts, instead of applying the MPs ?
thanks