Process Sceduler Limitation (Job Set with Multiple Jobs)
I just came to this conclusion and found that, there is a limitation on # of Jobs you can define (use) within a JobSet to Schedule. OK, here is the thing.
1. I have a Job with Three Process (AE, AE, SQR). Name : Job A
2. I have created a new Job (Job again with 6 instances of Job A. (why: because i had to run the same set of process for Different Bu and Run control combination).
3. Scheduled a Job Set (Schedule Name: JobJ) to run Job B with DIfferent run controls.
4. run the Step 3, 3 Jobs within Job B ran successfully/Posted and remaining Three Jobs show pending or stay pending with the main Job set (JobJ). and the Main JobJ show --> Success Posted.