Integration Message Error from PT8.53.06 to PT8.49.27
edited Nov 27, 2013 5:56AM in PeopleTools and Lifecycle Management - PSFT (MOSC) 10 commentsAnswered
When I tried to send a message from PT8.53.06 to PT8.49.27, I received an error "The response document from node <PSFT> is missing the required element 'Parm'. The number of Parm(s) must match the element parameter's attribute count. " I think I covered all the configurations, but maybe I am missing something. On the other hand, when I message from PT8.49.27 to PT8.53.06 it has no problem at all. On each Toolset, I use the local gateway for default local node, and a remote gateway for the remote nodes.
0