Apply PSU to RAC with Logical Standby Dataguard
Hi,
I want to apply the latest 11G R2 PSU (11.2.0.3.10) to a RAC cluster with two nodes and one logical Standby Dataguard instance, I already searched through the documentation and understood almost every step except the steps I need to perform on the logical standby.
I found some interesting documentation and even blogs describing this procedure but to physical standby where I basically interrupt the rac -> dataguard process flow and then after patching the primary nodes I re-enable it, but I am finding it hard to find a detailed description of the steps involved when it is a Logical Standby.