OAM 11g Release 2 integration with OIM 11.1.1.3.
Hi,
I am upgrading OAM from 11.1.1.3 to 11.1.2.2.
Currently I have OIM-OAM integrated.
Is it advisable to Upgrade only OAM to 11.1.2.2 first and then later upgrade OIM to 11.1.2.2.?
Or do I have to upgrade all the components together?
Thanks,
Selva