How to apply PT patch to PUM FRESH Demo install?
I have deployed HCM PUM 30 as FRESH Demo on Windows platform.
Running into an issue when trying to apply the PeopleTools patch 8.57.06.
As a first step, I ran "psft-dpk-setup --cleanup".
This command ran successfully, but deleted HCM Demo database.
By default, the Oracle server and database was under PSFT_BASE\db.
After the cleanup, the "PSFT_BASE\db" folder contents were lost.
What is the correct way to apply the PT patch to PUM FRESH Demo, but save the database from deletion?
Thanks,
Al