Peopletools 8.57 IB failover setting issues
Hello,
I'm setting up IB domain fail over in my CRM 9.2 application.
1 - Set up 2 domains with Dynamic slave settings (Domain status page > Set up Failover)
2- Set up Master/salve load balancing (Domain status page > Master/slave load balance )
Domain1 (master)
Domain2 (dynamic slave)
IB messages are published and i brought domain 1 down (app server to test the fail over). As expected the messages were processed on the dynamic slave domain.
Issues:
Before bringing down the Master domain (domain status page is showing the domain 1 as master and domain 2 as dynamic slave - when you hit refresh multiples times as well)