adop finalize running long post 12.2.10 patching
We are upgrading from 12.1.3 to 12.2.10.
12.2.10 patch (applied in downtime mode) finalize running longer (more than ~ 3 hours)
followed below note and gathered stats on Data dictionary which didn't help
EBS 12.2.4/adop Phase=finalize Taking More Time Than Expected (Doc ID 2497106.1)