Cannot assign a PC cost row to an asset
Hi,
Can someone please tell me what field/fields and the status of the fields on the PS_PROJ_RESOURCE allows the costs to be selected and assigned to an asset? I am having a cost line that cannot get assigned to an asset.
Thank you
Janel