Paycycle JOb
Hello,
In PeopleSoft when scheduling a Paycycle job the do we have to give a output location for check paycycle ?
We have a check paycycle that is scheduled to run through paycycle job. The check paycycle has pospay too.
The issue that we are facing is
- In the paycycle job we specify the Output Destination as the printer path
- When running the check paycycle, the check is printed, but the pos pay file is failing (as the output directory is a printer)
How can we have the check sent to the printer and the pos pay to a different location using paycycle job ?