How to create a project-driven orderless and avoid consuming material of common inventory?Summary: When creating a project-driven orderless, the flag for common inventory ("Use Common Inventory") is checked by default at the backflush materials screen. How co…
-
How to return items against work order to inventory after pick materials for work orderSummary: We want to know the workaround way to return the items against work order for unused items to used in other work order. Suppose we have a WO-1 need some items a…
-
Rel 23D: Pick Materials for Work Orders using Additional ParametersSummary: Pick Materials for Work Orders using Additional Parameters (update 23D) - Demo Link Content (please ensure you mask any confidential information): For work orde…
-
takt time calculationSummary: Hello All, One of my customer wants to see visualization of Takt time with a countdown clock for technicians logged into the order; multiple technicians may be …Vishnuvarth Subramanian-Oracle 12 views 2 comments 0 points Most recent by Elaine Wan-Oracle Manufacturing
-
Need to reduce Work order quantity of Closed Work OrderHi I Have One scenario. the work order with 100 Qty was completed, closed, costed, and accounted for last month needs to be reopened. We plan to make changes to the quan…
-
How to change the Transaction date in "Review Dispatch List" ?Summary: While executing some backdated Work orders, I need to change the Transaction date but it's not allowed in "Review Dispatch List" i need to change the date to be…
-
Is there any way to check the work order start and completion date changes done on the work order .Summary: There has been many revisions that are seen in OSP Purchase order that are seen triggered automatically. To check this we want to see if there are any date chan…P.S.Nikhitha Muduliar 11 views 3 comments 0 points Most recent by Prasanth Senthivel-Oracle Manufacturing
-
Is there a way to programmatically import/upload quality results to WIP inspection plan?Summary: Manual entry of quality results is very cumbersome. Looking for options for programmatic upload. Content (required): Version (include the version you are using,…
-
Error in Oracle Visual Builder Add-in for Excel: "This row has been modified by another user."Summary: Error in Oracle Visual Builder Add-in for Excel: "This row has been modified by another user." Content (required): We have a use case where we are mass-updating…
-
To-Transact Quantity Issue When Reporting Work Order Material TransactionsSummary: Review FA:SCM: 24A 24B: To-Transact Quantity Issue When Reporting Work Order Material Transactions (Doc ID 3020532.1) Content (please ensure you mask any confid…
-
How do I configure Fusion Contract Manufacturing for a sequence of Contract Manufacturers?How do I configure a supply chain for Cloud Contract Manufacturing which includes multiple separate contract manufacturers and ends with a distribution 3PL; OEM (contrac…
-
our client is moving from EBS to cloud. Need column mapping from EBS to Cloud for mentioned columnSummary: our client is moving from EBS to cloud. As part of data migration, we have mapped all the required columns except the below ones. wip_entities KITTING_JOB WIP_A…Balaji Midhun Kumar Sanagapalli 22 views 7 comments 0 points Most recent by Thierry Lamote Manufacturing
-
How to select alternate resources from WD while completing orderless completionSummary: Is there any way to select alternate resources in "Report orderless completions" task where we have multiple alternate resources in single work definition Conte…
-
How to add custom report when performing Release and Pick Materials in Manage Work OrdersSummary: We have a requirement where we want to trigger a custom BIP report along with Print Pick Slip report when we perform Release and Pick Materials in Manage Work O…
-
Which API can query the corresponding purchase requisition according to the rework orderSummary: Which API can query the corresponding purchase requisition according to the rework order Content (please ensure you mask any confidential information): Version …
-
Is there a way to create alternate work definition names as we did in EBS?Summary: Is there a way to create alternate work definition names as we did in EBS? That is create a set of names prior to assigning them to assemblies. Or do we have to…
-
is there any REST API to create a resource calendar Exception?Summary: We have a requirement to reduce resource ( equipment) capacity in manufacturing org through Resource calendar exception for the planned start time and planned c…
-
What is the better model to design injection moulding process - Discrete or Process?Summary: Our client has three different processes - injection moulding, packaging, & customized packing with barcoding, the later two fit the discrete model perfectly. I…
-
Print component listSummary: hi Expert I'm using Print Component List to see the WO component , may I have an option to not see the bulk items for example , to see only the pull and push ? …
-
Error in Cost Accounting Distribution Process - WIP Product CompletionSummary: We occurred this error "The transaction wasn't processed because the cost calculation for accumulated work-in-process requires all the input and resource transa…
-
how to create work order with specific version of componentsSummary: Hi, Our client is using discrete manufacturing and many of their products and components undergo modification ( revision update on item) because of customer fee…
-
Not able to see OSP PO details in "Review Production Transaction History"Summary: When we create a WO with OSP operation in Process Manufacturing we are not able to see the PO details in the production history, although the columns are availa…
-
For Orderless completion can we restrict this only to certain set of itemsSummary: Hello, For Order less completion we generally do enter item number to complete the transaction, can we restrict this only for a certain set of items? Content (p…Venkata Phani Srinivas Nutulapati 12 views 1 comment 0 points Most recent by Raj C -Oracle Manufacturing
-
Exceptions should not allow the work order to be completedSummary: The business requires that exceptions affecting work orders with status unrealase and release cannot be completed while the exception is still in open status. C…
-
OSP Operation attachment to OSP POSummary: OSP Operation attachment to OSP PO Content (please ensure you mask any confidential information): Hello Experts, I have created a Supplier Operation with an att…
-
Exceptions do not close automaticallySummary: The business needs some production exceptions to be closed automatically after a certain amount of time has passed. Content: In 'Report Production Exception', t…
-
Complete with Details is greyed out for scrap and complete quantitySummary: The Complete with Details button is greyed out when user enters the value for scrap and complete quantity in the review dispatch list. It should allow the user …
-
How to reduce quantity in the OSP Purchase ordersay there is a scenario where there is a work order of quantity 100 and it includes an OSP supplier operation. so while completing the work order, OSP requisition has be…
-
how to restrict 'To Transact' quantity during backflash equal to Required quantity for a work orderSummary: While doing a Work Order Completion with details, user do the Backflash, where for a component the require quantity let say is 500 no. and To Transact is 500. B…Kapil Dev Sharma-Oracle 83 views 10 comments 0 points Most recent by Kapil Dev Sharma-Oracle Manufacturing
-