Get Started with Redwood: Oracle Cloud SCM and Purchasing
Production Execution
Discussion List
-
There is no restriction on work order validity i.e completion dateSummary: There is no restriction on work order validity, once work order completion date is achieved system should not allow further work order transaction to happen for…
-
How to automatically backflush Assembly pull components through Rest API for orderless transactionsSummary: How to automatically backflush for Assembly pull components through Rest API? Content (required): We have a requirement where we have non-lot-controlled compone…
-
Report Material Transaction on Work order needs to restrict users within a specific toleranceSummary: Report Material Transaction on Work order needs to restrict users within a specific tolerance Content (required): There is a need to restrict the shopfloor user…
-
Not able to see substitute item option on discrete manufacturing work orderSummary: Hi, I'm not able to see substitute option on discrete manufacturing work order. Content (required): Hi, I've defined a substitute item on item structure and sam…
-
BOM modification in PIM, the WD should update itself automatically.Summary: In the WD, there is the BOM, when we have a BOM modification in PIM, the WD should update itself automatically. Content (required): Version (include the version…
-
We would like to update Lot status for orderless completions through REST APISummary: We would like to update Lot status for orderless completions through REST API Content (required): We have a scenario while performing orderless completions for …
-
Unable to bulk assign pre assigned serial numbers during work order completionSummary: steps performed: 1. item with lot attribute as dynamically generate and serial number as preassigned. 2. generate preassigned serial numbers 3. use the item for…
-
Can we reopen a closed work order when the costing period is still open?Summary: Due to some issues on the planning , we had duplicate work orders generated in the system. Users from shop floor have completed without realizing it and compone…
-
How to provide Lot DFF's during work orderless completion while entering completion LotsSummary: We have created Descriptive flexfields in "Maintain Lot Numbers" flexfield but while we are performing work orderless completions we are unable to find Lot DFF'…SK Kousar Sulthana 22 views 2 comments 0 points Most recent by Prasanth Senthivel-Oracle Manufacturing
-
Can I use a phantom item that lists both output and input items in a process work definition?Summary: Use a phantom item that lists both output and input items in a process work definition Content (required): Use case: client needs to define multiple output prod…
-
What is the logic to update Due date at WO in Reservation window?Hello Team , We are trying to update the SSD and RSD (Request Shipped date) at sales order, and we are expecting to make the changes in back-to-back WO Due date in reser…
-
Why system allows material transactions even after work order is marked as undercomplete?Summary: We are using process manufacturing. Marked a work order as 'undercomplete', Work Order status changed to 'Complete' but still Work Order is appearing in review …Uma Shankar Kumar 21 views 5 comments 0 points Most recent by Prasanth Senthivel-Oracle Manufacturing
-
What is significance of 'Start or Stop Operation' button at Review Dispatch List page.Summary: What is significance of 'Start or Stop Operation' button at Review Dispatch List page. Is it only indicative or does it also capture real execution time of an o…Uma Shankar Kumar 23 views 2 comments 0 points Most recent by Prasanth Senthivel-Oracle Manufacturing
-
Can we keep Work Order open even all qty completed?Hello Team, In Oracle fusion, we need help to understand if we can keep WO always open until business close it by any external system or manually? Mostly once last opera…
-
Repeating resource exceptionsSummary: Repeat resource exceptions for a specific day in the week Content (required): I have two questions: 1> We would like to repeat resource exception for a specific…
-
Negative quantity transaction at WOHello Team, Is there any possibility to perform the negative quantity transaction at WO at any level of operation sequence? Example - Initially I have created 10 quantit…
-
Level on item StructureSummary: hi Expert does exist option to see the level number of structure on Assembly item? BR Sassi Content (required): Version (include the version you are using, if a…
-
How to mass upload supplier operations through FBDI for Lot controlled Pull componentsSummary: Is there any feasibility to mass upload work order completions for supplier operations which are having Lot controlled pull components. Content (required): We a…
-
How can we deactivate a work definition in Pending Inactivation status.Summary: How can we deactivate a work definition in Pending Inactivation status. When we tried to deactivate them the system asked for approvals with some approvers who …
-
Is it possible to see the last operation scanned for the work order on the Manage Work Order pageSummary: Is there a way to quickly see the last operation scanned in the production process for the work orders on the Manage Work Order page itself rather than drilling…
-
Common RoutingSummary: hi Expert Does exist a common routing in cloud fusion that can used for all jobs? BR Sassi Content (required): Version (include the version you are using, if ap…
-
For Oracle MFG how to Auto Capture & Propagate Lot / Serial Number from one Ops to another?Summary: For Oracle OPM/Discrete MFG how to Auto Capture & Propagate Lot / Serial Number from the Initial Cast Item till FG (ready for dispatch) without user having to m…
-
Seperate visibility of the Maintainance and Manufacturing Work Definitions dataSummary: We have an Inventory organization enabled for both Maintenance and Manufacturing. We want to keep the data for each separate, as in the Manufacturing users shou…
-
What is the benefit of the Work Order under-completion tolerance in Process mfg?Summary: In Process mfg, the under-completion tolerance is on the batch quantity rather than the output quantity. Content (required): In Discrete mfg, where the WO outpu…
-
why WIP scrap transaction not showing in Review Completed Transactions window.In oracle fusion, why WIP scrap transaction under the work order has not showing in "Review Completed Transactions". I can see it in "Review Production Transaction Histo…
-
Change operations details in work definition where standard operation is usedSummary: Change operations details in work definition where standard operation is used, without breaking the link between standard operation and work definition Content …
-
Load work definition through FBDI without adding component detailsSummary: Load work definition through FBDI without adding component details Content (required): We are using FBDI to load new work definitions (WD) - Process manufacturi…
-
How to report work order material transaction in Secondary UOM rather than Primary UOM ?Summary: How to report work order material transaction in Secondary UOM rather than Primary UOM ? Content (required): How to report work order material transaction in Se…
-
Combine components from multiple Work orders under one Pick slipSummary: Combine components from multiple Work orders under one Pick slip, so that user can pick all components required for a day using one pick slip Content (required)…
-
Is back to back cycle synced with process manufacturing?Summary: I know that back to back is available for discrete manufacturing but is it available for process manufacturing or planned to be executed in future and is there …