Preventive Maintenance
Discussion List
-
how to create maintenance requirement based on type: itemSummary: Hi I would like to know what are the characteristics or specifications which an item must met in order to create a maintenance requirement item type in a mainte… -
Install Base Asset creation of sub assemblies under finished good through SO FulfilmentCurrently client is looking for the sub assemblies under Finished good to be created as IB assets. When we shipped out the Finished Good the IB Asset was created through… -
How can I configure suppression for below scenarioSummary: How do I configure suppression for day-based work requirements where one has a 60-day interval and the other has a 90-day interval? Both work requirements have … -
Kitting and Dekitting with MaintenanceSummary: Hi All, We would like seek support on the below requirement , Whenever we perform a maintenance activity on an Asset which is actually a Kit (Probably a turbine… -
Shift Schedules changed in plant parameters of maint org does not generate forecastingSummary: We have shift schedule marked as monday to friday timing 08:00am to 05:00pm and under standard operation resource assignment we have marked scheduled as YES so … -
Maintenance Asset history importSummary: Hi Community We are looking for a solution to import Maintenance Asset history details as we are planning to convert the data from legacy system to Oracle Cloud… -
Can a work order header DFF be used in the Work Order Deferred Approval workflow rules? How?We have defined a DFF field in the work order header. We have a requirement to use that DFF field in the rules of the Work Order Deferred Approval workflow. If it is pos… -
post refresh jobsSummary: Since we have been switching on Redwood Functionality, we have to run a list of post refresh jobs. However jobs take a very long time and we're checking whether…Honor Robins 123 views 1 comment 0 points Most recent by Deaconu Constantin Valentin-Oracle Human Capital Management -
Manage Coverages - Repair Transaction CodesWhen creating a Coverage in the maintenance module, would the "Repair Transaction Codes" field refer to the "components" of a distinct asset that may be covered by the w…Raul Cesar Bezerra Vasconcelos 93 views 2 comments 0 points Most recent by Sadagopan Kulasekaran-Oracle Maintenance -
I can execute work orders in mfg, though the asset resource instance has open mnt work orderSummary: Hi experts, A) I have an asset A1 which is linked to a work center. B) There is a resource in manufacturing R1 whose instance is linked to asset A1. C) I have a… -
Asset hierarchy was not created in Install Base for a Kit Item after SO shipmentSummary: We have a kit item shipped out of inventory .As per business both parent and child items are inventory items with serial numbers.We are expecting that asset hie… -
is it possible to associate a Supplier warranty with PO?Summary: Hello All, Im currently wondering if there is a relation between supplier warranty in maintenance and PO, customer wants when purchasing an Item to have it's wa… -
Fusion Maintenance - How to add anew lookup values of maintenance resource type fieldSummary: Hi , How do I add the new values on the lookup maintainance resource type values? -
Outsourced Work Orders inquirySummary: I am working with a client who intends to implement Oracle Fusion Maintenance for managing their assets. However, the client will not be performing maintenance … -
Unable to create Maintenance WO in Help deskWe have a requirement wherein users create Work Request in Help Desk. The Maintenance Manager then reviews these Work Request and create a Work Order for it. But in our … -
Meter Based Preventive plan for meter with irregular readings or intervalsSummary: We have a business requirement where we need to create a meter-based preventive maintenance plan, but challenge is the meter intervals are at different frequenc… -
Need clarity on additional licenses required for using the Help Desk work requests featuresSummary: In the Implementation Guide document, it is mentioned that - To submit a Work Request for an Asset, you don't need any additional subscription. However, to mana… -
When adding Supplier operation facing error The work order is marked for out-of-sequence completion.Summary: When adding Supplier operation facing error The work order is marked for out-of-sequence completion. Content (please ensure you mask any confidential informatio… -
Unable to Import Failure Set via FSMSummary: we have client requirement to enter around 2000+, "failure chain" combinations in single failure set. But currently when we try to import them via Functional se… -
After Work order completion need to notify to production/manufacturing teamSummary: Hello team, Is there any option to create a notification when Maintenace work order is completed or closed? There is a requirement where the business needs to s… -
Can you change work order sub type which is generated by preventive maintenance programSummary: Can you change the work order subtype that is generated by the preventive maintenance program? The work order generated has a subtype of 'Planned.' Can we chang… -
Restrict the creation of Work Order for an asset which is having open work orderSummary: Hi Team, We have a business requirement to restrict the user from creating a Work Order for an Asset that already has an Open Work Order. For Example: A user ha… -
Mass create failure SetsHi. Is there any way to mass create failure sets? I found this REST API but I couldn't build a payload to test it in postman /fscmRestApi/resources/11.13.18.05/assetFail… -
is it possible to create corrective maintenance work order based on meter readingsSummary: Hi Team, We would like to explore more on the functionality of generating a Maintenance work order based out of Meter readings, We do understand that ,With mete… -
Preventive Maintenance Program Calendar Visibility with Supply Chain Planner (Planning module)Summary: Hello All We have a requirement to ensure that the Preventive Maintenance program calendar is visible or shared with the supply chain planner, so all relevant s… -
How to handle Validation Organization for Customer Assets for two separate Master/Item OrganizationsWe have two separate Master/Item Organizations, each one has its related Maintenance Organizations secured and controlled by different parties. Based on the "Validation …
-
Unable to change the lot, grade of item after work order returnSummary: we have requirement to change the lot of an item returned to inventory via work order return. 1. create a work order for an asset linked to asset item 2. retrur… -
Is it possible to setup approval work flow across maintenance work definition?Summary: Hi All, Could you please help us sharing some insights whether it is possible to setup approval work flow across maintenance work definition as we have a requir… -
Preventive Maintenance Plan Flexibility/TolerancesSummary: Customer Needs flexibility/tolerance option in the Preventive Maintenance Plan to allow for adjustments in the Preventive Maintenance frequency. Also, need to d… -
Not getting confirmation message for Work Order Material TransactionsSummary: In Maintenance Cloud Work Orders the "confirmation message appears while we perform resource transactions" while perform the "Review Maintenance Dispatch List" …Madhan.venkat-Oracle 25 views 4 comments 0 points Most recent by Prasanth Senthivel-Oracle Maintenance