Multi-period data load
Summary
Does SDM allow multi-period data to be loaded through one flat fileContent
In Supplemental Data Manager, it is required to prepare data set and deploy the form template for specific Entity, Period and Scenario.
However, is it possible to load multi-period data vide SDM to meet the scenario loading the data for entire year (P1 - P12) through one file.
Presently it is only possible to load data for one period at a time.
Version
19.02
Tagged:
1