Coverage adjustments dates need to be synced with product term period.
Summary:
Coverage adjustments dates need to be synced with product term period.
Content (required):
We have a requirement where business wants to sync coverage adjustment line dates with product term period.
Steps we have followed:
------------------------------------------
1. Added an extended warranty item in a subscription.
2. Added a standard coverage within the extended warranty item.
Observed that, start and end dates of those coverage adjustment lines are getting auto populated with the default dates provided during the standard coverage creation. So that's why, those dates are not getting adjusted according to the warranty term period.
Business Requirement:
-----------------------------------------
Start and End dates of coverage adjustment lines need to be adjusted as per coverage product (type of Warranty item) term period.