26C Redwood Maintenance Work Orders does not default the defined WIP Material Storage Locator
Summary:
The WIP Materials PUSH Storage Locator is not being used as a default value when creating Work Order Materials Requirements. This value was used flawlessly on the Classic version on the page. The fact that it's not defaulting the value is creating a great deal of confusion and additional work for the end users. Is there some configuration choice that I am missing that would allow the default locator to populate and speed the end users through the creation of work orders.
Content (please ensure you mask any confidential information):
An example of the issue with screenprints is in the attached file.
Tagged:
0