UOM list of value is empty in Supplier Operation of Work Definition Redwood UII tried to create Supplier Operation in Work Definition Redwood UI. In lead times section, we need to choose the UOM of the supplier operation duration (Day/Hour). But t…
-
Does a Process MFG Item Structure have to be defined based on making a singe unitHave a situation where a client needs to start using an Item Structure with their Process Manufacturing. All new Work Definitions will need to be created for use with th…
-
How to Restrict "Production Shift report" delete option by "Production Supervisor"Summary: "In the Production Supervision Workbench, when a Production Supervisor creates and submits a shift report, it is currently possible for another Production Super…
-
Pass DFF Segment value from Standard Operations to Work Definition (Operation/Resource)Summary: We have a business requirement to pass DFF Segment value from Standard Operations to Work Definition (Operation/Resource) Does Standard Functionality support th…
-
Creating back to back work order in unreleased statusSummary: Hi! We have executed the back to back flow of sales order and successfully generated the work order in released status. But we want to generate the work order i…
-
Change Work Order status from Released to UnreleasedSummary: Change Work Order status from Released to Unreleased Content (required): Experts, Need a piece of advice please. I remember we could change the status of Work O…
-
Cannot reverse to ready outside processing step for supplier serviceSummary: We created work definition for outside processing with 3 steps. We have an outside processing item defined for the supplier service. Oracle is integrated with o…
-
Outside Processing Requisition failing on import to PurchasingSummary: Outside Processing Requisition failing on import to Purchasing with a 'The value of the attribute Source Agreement isn't valid.' error message which one can see…
-
Manufacturer onboarding advisorSummary: Need help in setting this up: Manufacturer onboarding advisor: Helps design engineers streamline the manufacturer and supplier onboarding process. For example, …
-
I want to make the Transaction note field mandatory using the sandbox for a particular plant.Summary: In my current project, I have four plants, and one of them requires making the transaction note field mandatory while executing the work order. To achieve this,…
-
Data Fetching bug on the "Manage Items" ScreenThere is an issue with the data fetching behavior on "Manage Items" screen. To request a fix, I will create a Question in CCC. Navigation Path: Product Management > Prod…
-
SQL query for Work Definition Details Unassigned ItemsSummary: Hi!, I'm looking for a SQL query for Work Definition Details which identify Unassigned Items. I try with material disable date, effective date, inventory item s…
-
Unable to search or Select Completion Locator in Work definition Redwood UISummary: There is no option to search or select Completion Locator in Work definition Redwood UI. It is difficult for user to remember all locator if we don't have an op…
-
Workstation Monitoring page refresh automaticallyIs there a way we can automatically refresh the Workstation Monitoring Page under Production Supervision in the Oracle Manufacturing cloud, so that the KPI matrix number…
-
OTL and Manufacturing IntegrationSummary: We operate in Project driven supply chain and have a requirement to capture Work Order resource time in OTL We expect when logging Resource time, the Work Order…
-
Return a CM work orderSummary: Hello, We have a requirement to return a CM work order that is already completed and the FG inventory is created. The PO released as a part of the CM work order…
-
24D feature Backflush Lot Material During Operation Completion using API not workingSummary: Backflush Lot controlled Material During Operation Completion using API not working 24D update Content (please ensure you mask any confidential information): 24…
-
Partial approval in WIP inspection for a lot with material statusHello, I have the following scenario: We created a manufacturing work order and generated a lot. this lot has a material status by default. During the WIP inspection, so…
-
DFF values from Manufacturing Work order to OSP PRHi All Is there a standard way for passing DFF values from Work order to the OSP PR ? Will it be extension ? Service mapping ?
-
Best Practises to do corrections to material or resource quantities against a closed Work OrderHi Experts, I am looking for the Best Practises to do corrections to material or resource quantities against a closed Work Order. For ex. a WO was either over issued/und…
-
How to identify the reason behind job close variance and how to derive the calculation?Summary: We have observed some work orders going into job close variance when we check the WIP job close event in cost accounting distributions. Please help us with how …
-
Mandatory Redwood features in Oracle Fusion starting 25B - ManufacturingWhat all Redwood features are going to be mandatory starting 25B in Manufacturing Module. We are referring to Oracle documentations for the redwood features however ther…
-
Make a field mandatory in orderless transactionsWe need to make the "Note" and "Transaction subtype" fields mandatory when the user reports an orderless completion Version (include the version you are using, if applic…
-
Sales Order to Work order mappingHello All, In manufacturing, we have a requirement to map work orders against sales orders. The only source of demand for Planning is Actual Demand (SO). When the Work O…
-
Configurator with process manufacturingDoes Configurator work with process manufacturing?
-
How do you reflect component substitutes on an item structure to the work definitions?If an item structure was created in the past and you go to add a new substitute to one of the components, the substitute does not update the work definition and can not …
-
How to Scrap A Component In An Operation In A Work Order in Oracle Fusion?Summary: How to Scrap A Component In An Operation In A Work Order in Oracle Fusion? Content (required): . Version (include the version you are using, if applicable): Cod…
-
Is there a way to estimate the WO cost before it is completed?Summary: Hello, Is there a way to estimate the cost of a WO before it is completed? Business wants a cost estimate to all the current and future work orders for some bus…
-
Cross BU work order costs are not interfaced to projects.Summary: When project belongs to a different BU/LE than the BU/LE of work order, costs are not interfaced to projects. Content (please ensure you mask any confidential i…
-
how to configure a work definition for growth in process manufacturingSummary: Process manufacturer has a process in which the batch doubles in size/volume/weight at each of multiple operations. How can this be defined in a Work Definition…David Swanson 12 views 1 comment 0 points Most recent by Radhakrishnan Angappan-Oracle Manufacturing