Best Of
Re: How to set up Puerto Rico chauffeur tax
Hi - This is not seeded by EBS Payroll. Guidance on how to set it up is outlined in My Oracle Support Document 1913616.1 - How Do You Set Up The Chauffeur Tax For Puerto Rico?
Re: Populating the HOURLY_RT field on JOB record from Global Payroll setup
Try these steps:
- Define Weekly Frequency as 40.61 in the Job Code/position record
2. Enter 8 Standard Hours, frequency D264 for the employee in Job Data
Note: Ensure you already have the correct setup in your Pay Group D264, M
3. Calculate the compensation for your employee in Job Data
4. You should get the correct results for hourly, daily and monthly
Hope this helps you!
Thanks,
Lulu
Re: MRP for Semi-Finished Manufacture
Hello Murilo,
There is no ready means to create a consolidated work order. This would best be a manual process, to have the greatest flexibility. The lot for lot order policy code, by design, will only bring the requirement quantity, date by date. A consolidated order would carry the excess inventory from the date of the first demand to the date of the subsequent demand date. Hence, a planner can alter messages as needed to meet constraints that are outside of the planning setup. You may want to consider using fixed order quantity (OPC=2) or a minimum or a multiple if that would meet your business requirement. Order Policy Code 4, periods of supply, allows for consolidated orders, so is only recommended for lower cost items where carrying costs are not prohibitive. There are planning constraints for OPC 4 items, so recommendation is to test fully, prior to implementation of Period or Supply.
Regards,
Jeff
Re: What is difference of Cost element value "Equipment" and "Material" in EAM Parameter
Thanks, it just for clarification.
Re: What is difference of Cost element value "Equipment" and "Material" in EAM Parameter
Cost elements Material, Labour and Equipment by default are associated to material issue and return transactions, resource issue and return transactions of labour and equipment types respectively. In cases where a transaction costed to a work order cannot understand what cost element it is, it will use this cost element. Hope that helps.
Re: Oracle Data Guard Setup between windows DB servers
Hi,
The following link is a YouTube video that appears to explain Windows Data Guard.
https://www.youtube.com/watch?v=Km4wyIV722k
Regards,
asahide
Re: Listener log
You can also set the trace level by running lsnrctl
LSNRCTL for Linux: Version 19.0.0.0.0 - Production on 23-JUL-2025 15:29:46 Copyright (c) 1991, 2019, Oracle. All rights reserved. Welcome to LSNRCTL, type "help" for information. LSNRCTL> set trc_level 16
Connecting to (DESCRIPTION=(ADDRESS=(PROTOCOL=TCP)(HOST=****)(PORT=1521)))
LISTENER parameter "trc_level" set to support
The command completed successfully
LSNRCTL> set trc_level 0
Connecting to (DESCRIPTION=(ADDRESS=(PROTOCOL=TCP)(HOST=***)(PORT=1521)))
LISTENER parameter "trc_level" set to off
The command completed successfully
LSNRCTL> quit
Troubleshooting Guide ORA-3136: WARNING Inbound Connection Timed Out (Doc ID 465043.1)




