Hi @Ivy Lopez-Oracle , thanks for the reply. I have tried to check the AM Asset Work Center used and the Work Center used in the Manufacturing Routing, it is matched but the Work Order still does not change to Release when I run the Finite Scheduling.
-
Noted, thanks a lot!
-
Hi @Katerina Winklerova-Oracle , thank you very much for your reply. Noted on that, just checking is there an alternative way to do this for now?
-
The answer is Option A.
-
Hi @Ivy Lopez-Oracle, thanks a lot. I have tried to assign the Manufacturing Location to a Parent Location instead, and it works well.