Preventive Maintenance
Discussion List
-
Which serial control works for assets with serials if item has no serial control?What serial control should be used—Dynamic entry, Predefined, or No serial control—when the same item is used for multiple assets, and serial numbers are defined at the …
-
How to mass assign meter template to multiple assets?How to mass assign meter template to multiple assets?
-
Failing an inspection does not create a work order with the nominated work definitionSummary: Inspection has been setup with a DO action to create a work order with a work definition as below. when failing the inspection a work order is created, but it h…
-
How to get the work order operation completion status ?When we navigate to the maintenance work order operations page, for the operations which are completed we could see a checkmark. But when we check in the work order oper…
-
New Asset Number get generated when a PM/CM is Completed and Material is confirmed as IssuedSummary: We noticed recently that new sets of Asset Numbers are being generated automatically when a preventive/corrective maintenance is completed and the material used…
-
How to restrict the standard operation code drop down to only those of a selected work center?Summary: We are expanding the use of Maintenance to include multiple work centers and resources. When creating a manual work order, if the user attempts to added a stand…
-
is oracle fusion maintenance support Predictive maintenanceSummary: Content (please ensure you mask any confidential information): Version (include the version you are using, if applicable): Code Snippet (add any code snippets t…
-
Can we connect Microsoft Project to maintenance work order?Summary: Can we connect Microsoft Project to maintenance work order? Content (please ensure you mask any confidential information): I have found documentation said that …Tian Chen-Oracle 11 views 1 comment 0 points Most recent by Clara Azoitei-Support-Oracle Project Management
-
Anyone else having issues with the maintenance forecast after the last App "Maintenance" last week?Summary: Meter based work requirements that have yet to produce a work order seems the generate an entire forecast from 0 to meter to date reading and making the full fo…
-
How to control maintenance program data access at work center level or at role level?Summary: How to control maintenance program data access at work center level or at role level? Content (please ensure you mask any confidential information): How to cont…
-
Need to assign resource instance to WOSummary: I create a new custom role for Engineers, and need to assign resource instance to a work order in Manage Maintenance work order form, however i already added in…
-
Work Order ReferencesSummary: hi Team, could you please help me with identifying the table name where Work Order references are stored Content (please ensure you mask any confidential inform…Sanjeev Inampudi-Oracle 1 view 1 comment 0 points Most recent by Sanjeev Inampudi-Oracle Maintenance
-
Maintenance Work Order Approval WorkflowI navigated in "Manufacturing and Supply Chain Materials Management" and went to the task "Configure Electronic Signature Preferences". I added the inventory organizatio…
-
Operation in maintenance workorder grayed outHi, I have scenario where unable to complete operation, Created a WO with 2 operations Operation as OSP based and item added on it Operation without OSP with resource I …
-
Condition Event CodesHi, Could you please share any documentation against Condition Event Codes and where will these be used in maintenance ? Can we create WO through it ? Regards, Amandeep
-
Which table has attachment operation?Summary: In which OTBI table the operation attachment is saved for maintenance work orders? Content (please ensure you mask any confidential information): Version (inclu…
-
why generate forecast button is blocked in the work requirement pageSummary: Hello, I´m wondering why the "Generate forecast" button is blocked in every work requirement, anyone knows how to unluck this button for work requirements I nee…
-
What are the conditions to make appear a work order in Scheduling tab Maintenance supervisionSummary: Hello, Anyone could help me with this new feature Redwood: Use the New Supervisor Workbench since I couldn´t make work the Schedule in the feature. So, I create…
-
Difference between OSP and Create requisitionHi , what is the difference between OPS PO and a PO generated from "review purchase item" option in maintenance workorder ? could you please explain the business scenari…
-
Can we Create single Maintenance Work Order for multiple Maintenance Assets with project and task?Summary: The business is required to create a single work order with multiple maintenance assets in it with the same project and task information. To do that we need to …
-
Can I create maintenance program for 3 Yearly or 5 Yearly Maintenance?Summary: I have a requirement to create a Maintenance Program for 3-yearly and 5-yearly maintenance of an asset. Can we create maintenance program with 3 years of 5 year…
-
How to move asset to other org with same serial or asset numberHi. We are currently in the process of moving several assets between organizations In EBS, there is Asset movement workbench is available but we haven't found a similar …
-
Assets getting automatically generated in Maintenance once miscellaneous receiving is performed forAssets getting automatically generated in Maintenance once miscellaneous receiving is performed for serialized items. How can we avoid auto creation ? and it is creating…
-
No data available in Asset Information Management work areaSummary: We have created few work center assets in the instance. Still no data is available in 'Asset Information Management' work area. Is there any configuration requi…
-
What is the purpose of the barcode in the Work Order Material List report? Can you explainSummary: A barcode is generated for the work order in the Print Material List report. Could you please provide insights into the purpose and uses of this barcode? Conten…
-
Do we have Maintenance work order approval based on Inventory Materials (Item) used?Summary: Currently we do not have any approvals for Maintenance work orders. Now, we are trying to bring in approvals by e-signature for Maintenance Work orders. However…
-
My work orders are not showing on the maintenance work pageSummary: I am testing the new feature. I need to complete operations in the new "my maintenance work" feature. Content (please ensure you mask any confidential informati…
-
Create Maintenance Program from Subscription ContractSummary: We have a requirement to create maintenance program automatically from subscription contract. Is this feature available or Is there any link between Maintenance…
-
Maintenance Asset Part ListHi, While creating an asset in the Maintenance Management UI, I'm able to add a part list. Now, my question is: when I create a work order, is it possible for the associ…
-
Workorder Notification upon releaseHi Team, I wanted to send a notification of Workorder status change to maintenance manager or technician. Is there a way we can define notifications based on Maintenance…