Category 162
Discussion List
-
Make At Sourcing Rule & Create Supply FlagSummary: Make At Sourcing Rule & Create Supply Flag Content (required): We have a contract manufacturing model with Supply Planning in our scenario. We have around 11 co…SCMLEAD_AA 51 views 4 comments 0 points Most recent by Abhijit Joshi -Oracle Supply Chain Planning and Collaboration
-
Is ASL mandatory for sharing order forecast of Buy Items with Suppliers?Summary: Is ASL mandatory for sharing order forecast of Buy Items with Suppliers? Content (required): We know that an Approved Supplier List(ASL) is mandatory for sharin…SCMLEAD_AA 21 views 1 comment 0 points Most recent by MukulGoyal Supply Chain Planning and Collaboration
-
Shared MFG RES:How to split planned order for two items equally or in proportion to their demand?Summary: Shared MFG Resource in a Constrained Plan: How to split planned order between two items equally or in proportion to their demand? Content (required): Scenario: …SCMLEAD_AA 71 views 2 comments 1 point Most recent by SCMLEAD_AA Supply Chain Planning and Collaboration
-
CTO Options with Future Component Item Effective Start Date Not Shown in Demand Management UI TablesSummary: CTO Options with Future Component Item Effective Start Date Not Shown in Demand Management UI Tables, so we are not able to enter planning percentage for those …Xiangqun123 51 views 1 comment 0 points Most recent by Prateek_16-Oracle Supply Chain Planning and Collaboration
-
Using #Ignore for Customer/Customer-Site and Demand Class Dimension in Custom Measures FBDI File.Summary: Hi Experts, We have a Custom Measure defined to load Forecast Data via FBDI. At this time we have Forecast based only on Item-Org-Time Dimension (but we have ke…Jasvinder Singh-Oracle 71 views 3 comments 0 points Most recent by Scott Malcolm-Oracle Supply Chain Planning and Collaboration
-
Demand Plan suggestionsSummary: The Replenishment plan is scheduled weekly and Demand plan is scheduled monthly. Will switching the Demand plan from monthly to weekly will improve the forecast…User_2025-02-12-19-59-32-469 31 views 1 comment 0 points Most recent by A.Calder Supply Chain Planning and Collaboration
-
How can we apply different causal factors for a set of items in the same demand planSummary: Content (required): Version (include the version you are using, if applicable): Code Snippet (add any code snippets that support your topic, if applicable):Anirban Naha-Oracle 21 views 2 comments 0 points Most recent by A.Calder Supply Chain Planning and Collaboration
-
External Forecast cannot be disabled before the Demand Due DateSummary: I am trying to disable an external forecast and see that the system is not allowing the disable date to be before the Demand Due Date (USING_ASSEMBLY_DEMAND_DAT…SCMLEAD_AA 41 views 4 comments 0 points Most recent by Prateek_16-Oracle Supply Chain Planning and Collaboration
-
Pareto Analysis as a basis to segment Item as A, B & C ClassSummary: Our client classifies items as A Class, B Class and C Class based on Pareto Analysis for shipments history value. A Class items are the ones which contribute 80…Parag 41 views 1 comment 0 points Most recent by RakeshOracle-Oracle Supply Chain Planning and Collaboration
-
Manually Entered Fixed Safety Stock Demand Via Simulation Sets (SS Qty Override) is NOT visible.Summary: Unable to see the Safety Stock in Plan Output for - Manually Entered Fixed Safety Stock Demand Via Simulation Sets (SS Qty Override) - as per Safety Stock white…Jasvinder Singh-Oracle 71 views 5 comments 0 points Most recent by Jasvinder Singh-Oracle Supply Chain Planning and Collaboration
-
Is there a way to retrieve past forecast data if a targeted forecast refresh has been run?Summary: Is there a way to retrieve past forecast data if a targeted forecast refresh has been run Content (required): When we load an external forecast using the progra…SCMLEAD_AA 11 views 6 comments 1 point Most recent by SCMLEAD_AA Supply Chain Planning and Collaboration
-
How to create supplier planning table?Summary: Content (required): User would like to have the planning table in terms of supplier instead of simply by product for supply planning. This will help to consolid…Winky Chan 21 views 3 comments 0 points Most recent by SilviaCosentino-Oracle Supply Chain Planning and Collaboration
-
You can't do this action because the demand for the selected order lines is reserved.Summary: Hi Team, When we are trying to Edit the Line in Backlog Analysis, we are getting the below mentioned Error : Question/Doubt: For a Standard Sales Order (non Bac…Ravi Tak 21 views 4 comments 0 points Most recent by Shyam Patel Supply Chain Planning and Collaboration
-
Why is the PAB negative even outside of PTFSummary Why would the PAB be negative even outside of the PTF. Content (required): We have PTF of one day but we are seeing PAB being negative even after 1 day from plan…
-
How to archive External Forecast into a standard or custom measure?Summary: How to archive External Forecast into a standard or custom measure? Content (required): We are loading external forecasts using the FBDI upload process. If some…SCMLEAD_AA 41 views 9 comments 0 points Most recent by Vijay Pillarisetti-Oracle Supply Chain Planning and Collaboration
-
Suggestion for Best Way to HandleSummary: Content (required): Hello Friends Need a suggestion how to handle the below situation for supply planning. I am producing Item A in UOM as Each. I am taking 51 …Ashish_Kumar 31 views 5 comments 0 points Most recent by SNOP_User9 Supply Chain Planning and Collaboration
-
Backlog Management Demand Priority RulesIn the demand priority rules, can we define the sort order based on the demand class ( e.g. High Value, Medium Value and Low Value) ? Oracle Backlog Management : Backlo…SachinGupta9 71 views 3 comments 0 points Most recent by Raj C -Oracle Supply Chain Planning and Collaboration
-
Is buy sourcing rule without specifying supplier supported ?Summary: Is there a way to have a buy planned order that is released to a PR without specific supplier. Content (required): If someone wants to forecast demand and plan …ManolisV-Oracle 41 views 2 comments 0 points Most recent by ManolisV-Oracle Supply Chain Planning and Collaboration
-
How to load external forecast without customer details via FBDISummary: How to load external forecast without customer details via FBDI. Content (required): We have scenario to create the demand using external forecast FBDI file wit…
-
Is there a backend table that supports the UI View ' Audit Trail of Measure Updates' that can be queSummary: The Demand planning UI view does not allow you to search by item which is a key need for us. Content (required): Version (include the version you are using, if …Matt_L 21 views 1 comment 0 points Most recent by Raj C -Oracle Supply Chain Planning and Collaboration
-
How does Constrained Supply Plan work with multiple ranking sourcing rules?Summary: How does Constrained Supply Plan work with multiple ranking sourcing rules? Content (required): Let's Assume Demand is at Item1 and Org1. Sourcing Rule for the …Beauty Kumari 181 views 10 comments 0 points Most recent by Beauty Kumari Supply Chain Planning and Collaboration
-
Prevent release of planned orders from supply plan for a specific organizationSummary: Prevent the release of planned orders from the supply plan for a specific organization Content (required): What is the way in which planned orders in a supply p…SCMLEAD_AA 1 view 1 comment 0 points Most recent by Vamsi Sreeram-Oracle Supply Chain Planning and Collaboration
-
Unable to see the updated data of custom measure in DM cloud tables after specific plan (X) run.Summary: The the updated data of custom measure is not Visible in DM cloud tables after running a demand Plan(X) with refresh current data option selected. But the same …Akshay Joshi-Oracle 21 views 1 comment 0 points Most recent by Raj C -Oracle Supply Chain Planning and Collaboration
-
Item Lifecycle Phase attribute values in Sales and Operations PlanningSummary: Hi, I need to populate the "New Product Revenue" in Sales and Operations Planning and the expression used for the measure is - Case(Attr(ITEM, Lifecycle Phase) …sanjiiv.chavaan 11 views 1 comment 0 points Most recent by Raj C -Oracle Supply Chain Planning and Collaboration
-
How do you empower or have ways to make Suppliers commit to your forecastSummary: How to empower Suppliers to commit to your forecasts. After Covid-19 it's becoming very hard to get customers to commit to the order forecast. So its hard to ge…Vishnuvarth Subramanian-Oracle 21 views 3 comments 0 points Most recent by SNOP_User9 Supply Chain Planning and Collaboration
-
What is the meaning of the specified planning buckets in a constrained Supply plan?Summary: What is the meaning of the specified planning buckets in a constrained Supply plan? Content (required): I have defined the planning buckets in a constrained sup…SCMLEAD_AA 21 views 6 comments 1 point Most recent by Thierry Lamote Supply Chain Planning and Collaboration
-
Minimum shelf life for onhand lots pegged to demandSummary: Need to be able to set 'minimum shelf life days' for onhand lots pegging to demands. Content (required): It is a common practice in medical device companies to …Mani Rana-59197 151 views 1 comment 0 points Most recent by Thierry Lamote Supply Chain Planning and Collaboration
-
Alternate Sources (Organization) in Constrained Supply Plan - Not Recommending Desired Planned OrderSummary: Requirement: We have customer requirement to first source material from Surplus Warehouse (TRAD Org) and if material is not available there than it should be br…Jasvinder Singh-Oracle 41 views 1 comment 0 points Most recent by Jasvinder Singh-Oracle Supply Chain Planning and Collaboration
-
Lot for Lot PeggingSummary: Does Fusion Supply Planning allow for 'Lot for Lot Pegging'? Content (required): In EBS ASCP we had a feature called 'Lot for Lot' that we could set at Plan Opt…Bfrattar-Oracle 51 views 3 comments 0 points Most recent by Scott Malcolm-Oracle Supply Chain Planning and Collaboration