Category 163
Discussion List
-
Restrict work orders in production scheduling.Can we restrict work orders from coming in to production scheduling based on Work order statuses? (preferabaly custom status). if not any work around?
-
How to configure service mapping to auto populate priority field on Work orders released from MRPSummary: We have a scenario where we want to populate the Priority field on the work order whenever a planned order released by planning creates a work order through orc…
-
How to issue material from a single lot during backflushSummary: Customer is in consumer goods industry. Due to quality assurance requirement, they want to make sure that each batch of FG is produced with single lot of raw ma…
-
Outside Processing Work order shipment not generated and shows PO Approved as zeroSummary: We are stuck with an outside processing Work Order in which the supplier operation is not showing the shipment. There is no shipment line generated as well and …
-
Work Order Not Auto Completing when supplier operation added as last operationSummary: Work Order Not Auto-Completing when supplier operation added as last operation for non lot/serialized items Content (please ensure you mask any confidential inf…
-
How to mandate the work instructions to the operator at work definition level.Summary: We were able to successfully create the work instructions at work definition level. However, while Execute Production at a Workstation level before completing t…
-
How PS calculate work order prioritySummary: What all criteria PS checks to determine work order priority Content (please ensure you mask any confidential information): Version (include the version you are…
-
Why did not apper the supplier operation's exception when the item attribute "Purcahsable" was "No"Summary: Hi , This question might be similar with "https://community.oracle.com/customerconnect/discussion/907915/” I want to make sure each cases one by one. In this qu…
-
Work instructions, along with in-line directions and communication notes, during operation executionSummary: Ability to add detailed work instructions longer than 1000 characters in the Standard Operation, Work Definition, and Work Order, which should be visible to tec…
-
Subassy WO date didn't match with Parent WO in Production SchedulingSummary: if we move a parent FG WO date 15 days before from PS and Repair and released a planned make order for it subassembly from Supply planning which creates sub-ass…
-
Why did not apper the supplier operation's exception when Supplier site was inactive or invalid?Summary: Hi , When user released WO which has supplier operations, the operation's supplier was inactive or invalid. And the WO did not show any exceptions even the Supp…
-
When assigning work consider a resources union / employment seniority when qualifying operatorsHi community! How can we consider an employee's tenure / union seniority when qualifying operators to a task? Thx!
-
What are the basic setups or ETO item?Summary: I am learning how ETO process works in Oracle Fusion PIM/OM/MFG and Supply planning. Trying to understand the complete process flow. To begin it I am stuck how …
-
What is the best practice before we close the Work Order?Summary: What is the best practice before we close the Work Order? Content (please ensure you mask any confidential information):What is the best practice before we clos…
-
Need to be able to update OSP work order without canceling the PONeed ability to update OSP work order date after the PR is created but the PO is waiting to be created.Summary: Need ability to change the OSP work order dates after the…
-
Prevent update on discrete manufacturing Work Order after it is released/operation is initiatedSummary: Prevent update on discrete manufacturing Work Order after it is released/operation is initiated Content (please ensure you mask any confidential information): W…
-
rework serialized itemSummary: we have a scenario where we are sending out 300 serialized (serialized at receipt) items for rework to an outside processing supplier. We create the work order …
-
Has anyone encountered this type of random error pop-up? Do you know the meaning?User is getting application error randomly when navigating back to home page from Planning, PIM, Work Order Execution and Work Definition work areas. Indicates an applic…
-
OSP for raw materialHi Experts, How should we manage raw material items that are sent out for OSP (such as painting), then returned and stored as raw material with the same part number, esp…
-
REST API for Work Order Primary and Additional OutputsIs there any REST service available to Record the Product Completion in work order both Primary and Bi-Products
-
Is there a field in PO receipt screen to store the supplier lot number in Oracle FusionSummary: Capture Supplier lot number while receiving Purchase order Content (please ensure you mask any confidential information): Is there a field in PO receipt screen …
-
Create/Update Work Definitions via REST APISummary: Create/Update Work Definitions via REST API Content (required): Create/Update Work Definitions via REST API. I do not see any REST API to do this. Can somebody …
-
Anybody else having data problems with Clones from Prod to Dev instances since 25CSummary: Since our update to 25C, all our clones are having work definition data problems. We have done three clones to different instances. We even did two clones on th…
-
WIP_VIEW_WS_ASSIGNED_OPERATORS_PRIV and WIP_PERFORM_DISPOSITION_REJECTS_PRIV access not as expectedSummary: We validated two privileges via isolated custom roles and observed that removing them does not restrict the corresponding UI functions: WIP_VIEW_WS_ASSIGNED_OPE…
-
Receiving Outside Processing Purchase Order in Oracle FusionHello All, We have an Outside Processing Scenario where Supplier 1 makes a Part of the FG and then ships it to Supplier 2 to complete the remaining part of the FG, later…
-
How to set Default Supply Type as Assembly Pull for Non-Standard and Rework Work Orders?Summary: We would like to know how the Default Supply Type can be set to Assembly Pull when creating a Non-Standard and Rework Work Orders, its Default Supply Type is Pu…
-
There is some setting to prevent the LOT from accepting special features?Summary: Hello. I'd like to know if there's a way in the configuration to prevent LOT creation with special characters (#$%"°|_+´, etc). I see that, by default, the syst…
-
Limiting Lead Time Calculation to Active Work Definition Versions OnlySummary: We observed that the "Calculate Lead Times and Roll Up Cumulative Lead Times" process updates even inactive work definition operations (i.e., those with a past …
-
Can operator record uploaded editable PDF document on Work Instructions at work station?Summary: Business want to execute the work instructions checklist at the time of work order execution. We have now Work Instruction that execute at Work station by the o…
-
manage standard operationsWe are doing the setup for manufacturing and after having created manufacturing plants, work area, work center and resources, we are trying to create standard operations…