Production Scheduling
Discussion List
-
Is it possible to record the Production Operator's Working Shift when completing the Production?Summary: We have a requirement that when the Production is started/completed from Review Dispatch List, Production Operator wants to record his working shift. But the Bu… -
Need-By Override not updating work order start dates in PS after solveSummary: While trying to expedite a work order by putting 'Need-By Override' date, it is not updating work order dates in PS after solve process. Expectation is to repri… -
Pre-processing Lead Time in manufacturingHello Experts, We have a requirement to incorporate pre-processing time for certain manufacturing items that are produced only on specific days of the week (e.g., every … -
Production Planning: How can I define time dependencies between two resources?Summary: In the Production Scheduling I would like to have a time link between two resources Content (please ensure you mask any confidential information): I schedule re… -
Issue While Saving/Publishing Copied AI Agent Template – Operations Assignment AssistantHi Team, I am currently working with AI Agent Studio in Oracle Fusion and facing an issue while configuring a seeded agent. Scenario: I am trying to reuse the seeded age… -
Is it possible to see resource instances in production scheduling?Summary: Content (required): The assignment of a resource instance is performed at the operation level in the work order, and the customer wants to see it in the product… -
WOs are rescheduled within Fixed Time Fence in Production schedulingSummary: In Production scheduling, we have a scenario where we notice the Work orders which are in "Released" and "Firm" status and have their start date falling within …Caroline Durairajan 2 views 3 comments 0 points Most recent by Satwik Kumar Patel-Oracle Manufacturing -
Labor Resource Units calculation in Production schedulingSummary: We have Work centers defined with Equipment and Labor resources such that every operation uses 1 Equipment resource and 1 Labor resource for a work order. The L… -
Mass update Lead Times & RollUp Cumulative Lead Time for newly created non-sequential item numbersSummary: Calculate Lead Times and Roll Up Cumulative Lead Times process did not calculate the Lead Time after 26A upgrade. Impact now is causing irregularities in the pr… -
How to track workstation is availability in ManufacturingHello Everyone, Can we track a workstation availability, based on which we can route the raw materials or sub-assembly to execute operations? please help! cc: @Shyam Pat… -
Negative quantity transaction at WOHello Team, Is there any possibility to perform the negative quantity transaction at WO at any level of operation sequence? Example - Initially I have created 10 quantit… -
Work Definition Updates for Released Work Orders with Open OperationsSummary: Is there an option to pull the most updated version of the work definition for a work order that is in Released status and has an open operation? The work order… -
Integrate Production Scheduling with legacy system like ebs r12Summary: Hi, We want to know if its possible to integrate production scheduling with legacy systems like ebs r12. Currently, SCM cloud and production scheduling are inte… -
Is there a backend column name for Materials_Available field in WIE_MA_MTL_ASSIGNMENTS tableFor the above Material Availability screen, the backed table is WIE_MA_MTL_ASSIGNMENTS. Does the 'Materials Available' (red arrow above) field along with its values (Yes…Rajarshi Chatterjee 21 views 1 comment 0 points Most recent by Prasanth Senthivel-Oracle Manufacturing