Category 163
Discussion List
-
how to bulk complete a work orders in oracle fusionWe have a requirement to complete multiple work orders at the same time. is there any FBDI template or some other feature to achieve this requirement. Thanks, Srikar. -
Changes in item not sync to work definitionSummary: Changes in supply type, supply subinventory and locator at item level doesn't propagate/ sync to work definition where these items are used as operation item. C… -
in Redwood work definitions are duplicating on the listSummary: We noticed today that one item was listed 7 times on the Work Definition listing using Redwood. All the information is the same for each one. There is only 1 Wo… -
How to avoid Cost Variance during WIP Product ReturnSummary: Customer is producing same item in three plants. The cost of production is different in all three plants (due to changes in resource rates and overheads). Cost … -
On what basis is the supply type is determined for a specific itemWhile providing an overview about the Supply Types(Push, Operation Pull, Assembly Pull) to the Business, on what basis or business case should we determine item supply t… -
How does the supplier opertaion of serialized WO make backflush transation when OSP PO receiving?Summary: Hi, When user received OSP PO, the related WO(serial unit) did not happen backflush even the supply type is set operation-pull. So I would like to know how the … -
PS Changeovers in Work OrdersWith Changeover Rules defined properly, PS will determine the appropriate changeover time between two relevant operations based on the rules. Since this changeover time …A Bargeron 21 views 1 comment 0 points Most recent by Alex K-Oracle Supply Chain Planning and Collaboration -
can you add expense items as a material on a work definitionSummary: Can you add expense items as a material on a work definition? Content (please ensure you mask any confidential information): Can you add expense items(non-inven… -
Is it mandatory to have the last operation as “In-House” for Outside Processing?Hi everyone, We’re trying to understand if it’s possible to have an Supplier Operation as the last operation in a work order. In our case, we tested this by setting the … -
Contract Manufacturing - Two Work Order StrategySummary: Has anyone implemented a two-work-order strategy to separate discrete manufacturing (Oracle EBS and Camstar MES) and a separate contract manufacturing process (… -
Component Picking: Avoid reservation if the Stock exists in Supply subinventorySummary: Suppose Work order has a component X with source Subinventory & Locator as A. Assume Stock already exists in A, when pick process is run, the system creates mov… -
Scheduling cannot be done because work center resources are not assigned to shiftsSummary: We have all our resources assigned to 2 shifts in the work center (we have 2-shift workday pattern and all setups done as recommended) The resource is assigned … -
Scheduled Work Order Traveler print process causing duplications on shop floorWe currently have an ESS job scheduled to run every hour to print all work orders in the "Released" status. The problem we are having is that it will print duplicates if… -
OSP Service Item attributes, Cost?Summary: I’m looking for guidance on the correct attribute setup for an Outside Processing (OSP) service item in Oracle Cloud. Specifically: Is an OSP service item consi… -
Modeling OSP Scenario with Customer-Supplied Components – Guidance NeededSummary: We are evaluating solution options for a client scenario involving Outside Processing (OSP). In this case, the finished good (FG) is assembled and shipped by th… -
Will it be possible to add service item to BOM?Summary: Content (please ensure you mask any confidential information): Will it be possible to add service item to BOM, in order to rollup the cost of the service to the… -
Can we use manage service mapping for other modules like Work Order to setup default value for DFF?There's a requirement that when submit work order request, transfer work center value to work order DFF automatically. Now I tried to use function 'manage service mappin… -
Predefined Serial Number for Non Standard Work OrderHi Team For the items that are set as Predefined Serial number. Business ask is to have serial Number tab (screenshot below)for the Non Standard work order. This way the… -
Is it possible to restrict a work order to release by an error message when input item is expiredSummary: There is a business requirement to let the user know that a work order cannot be released because one of the components in the work order is already expired com… -
Release the reservation upon completion of the work order instead of upon closure of the Work OrderWhen closing the work order, a message appears stating that the reservations will be released. Is there a setting to release reservations upon completion of the work ord… -
How to auto-populate a DFF on the work order header with the Inventory Category of the primary item.Summary: We need to populate a DFF (in Additional Information) on RMA work order headers with the inventory category of the primary item so that we can use that field to… -
Want to return and install items to a child asset location that is different to the WO assetSummary: If a WO is raised against a parent Asset (e.g. Engine-01), is it possible to issue and return items against a different child Asset Number (e.g. Turbo-L/H or Al… -
Work order reversalSummary: Work order reversal Content (please ensure you mask any confidential information): I created a Work Order and completed the dispatch process. Subsequently, a di… -
How to upload Review Dispatch List by work orderHello Experts, I would like to know if there is any way to upload the Review Dispatch List in Oracle Cloud using Excel, or if Oracle provides any standard template for t… -
Where to input processing time on a work definition?Our business does not currently use Supply Planning, Order Promising or Sales and Operations Planning. They create work orders manually when ready to make an item. The p… -
Resource rate Plant LOV is not populating values in RedwoodSummary: When Creating Resource Rate from Redwood UI, the Plant list of values are returning Null. Cost Organisation relationship has been setup for the inventory organi… -
How to automatically calculate percentageSummary: Need guide to automatically calculate percentage of Output Cost Allocation. Content (please ensure you mask any confidential information): Hi I implement Oracle… -
Error with work order execution at the workstation (WIE-4426241)Summary: I have created a workstation and when trying to execute Production at this work station i am getting error as soon as i click on check in: You must be a part of… -
Update Operation sequence of a work definition through spreadsheetWe are trying to update a Work Definition Operation sequence of an existing work definition through a spreadsheet. We have enabled the Redwood UI for the Work Definition… -
Updated Calendar not reflecting in Maintain Supply Network Model TaskSummary: Updated calendar in Existing inventory organization ( Manage Inventory Organization ) which is manufacturing plant enabled. Done the collection and verified the…