Get Started with Redwood for Oracle Cloud SCM Begin Now
To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Manufacturing
Discussion List
-
How Many work definitions names can be create in oracle fusion manufacturing?Summary: Our customer requiries a lot of work definition for the same item. Content (please ensure you mask any confidential information): Our customer requiries a lot o…
-
Manage Production Value SetsSummary: For the configuration task Manage Production Value Sets under Manufacturing Master Data we are seeing value sets that are for modules such a General Ledger, HR,…
-
How to Restrict the Item Modification for Standard Work Order through Page PersonalizationHi, Requirement: The user should be restricted from modifying the Items/BOM at the time of Standard Work Order Creation alone. For Rework & Non Standard Work Orders this…
-
Existing data/Work Definitions are not visible on the new Redwood UI for Manage work DefinitionHi, I have enabled the 24B feature for Managing the work definitions using redwood UI but I am unable to view the existing data Link to the feature I have the roles and …
-
Variance between the quantities produced and the quantities after inspectionHello, I have the following scenario: the company is manufacturing Item X for example with quantity 100 produced. They are doing inspection, after inspection the quantit…
-
Can we close work order with the last transaction date?Summary: Dear Experts, Business performed last transaction (WIP Completion) in a Work Order on 31-Jul-24 11:59:59 PM When trying to close the Work Order with same date 3…
-
can't complete an operation while adding the scrap quantityHello, I created a work order. I need to complete the operation . I am editing the quantity of scrap items but the system is not allowing me to continue. please advise.
-
Can we calculate line efficiency in Process manufacturing in Oracle fusion manufacturingSummary: Content (please ensure you mask any confidential information): Version (include the version you are using, if applicable): Code Snippet (add any code snippets t…
-
Unable to search any details in Workdefinition screen with Redwood ExperienceSummary: We have enabled redwood experience for Workdefinition screen. We are able to create workdefintion, but unable to search the created workdefintion or any other e…
-
Work Order parts getting auto consumed not giving option to perform material reportingSupply type - Push Non serialized work order Non serialized make item Work Order created and released Material picking completed Part gets auto consumed without performi…
-
What is the setup required for items used in the OSP flow to run WITH FULL LOT CONTROL?The business needs to have traceability of the lots with which it is working They need to know the lot number of the finished product and its respective components But t…
-
Work Definition Updates for Released Work Orders with Open OperationsSummary: Is there an option to pull the most updated version of the work definition for a work order that is in Released status and has an open operation? The work order…
-
Backorder Work Order ComponentsSummary: Our organization uses Oracle ERP and integrates to Oracle WMS. We want to be able to send the full component quantity from ERP to WMS for each Work Order but du…
-
Create a custom field validationA question had once been raised in the community regarding customizing a page. What I need is that on the Dispatch List Revision page I can customize the validation of t…
-
Unable to search structure name while creating work defintionSummary: Unable to search structure name while creating work defintion Content (please ensure you mask any confidential information): I am trying to create work definiti…
-
Reference Routing for work orderSummary: in EBS , We need to have reference routing which can be attached while creating work order for the assembly item. HOw we can achieve same functionality in Oracl…
-
How to Handle Rework of Waste in Process Manufacturing?Summary: We have a case in process manufacturing where we have input as 1000 KG raw material and the output will be FG as 700 KG and 300 KG as waste that need to be used…
-
osp Work order SQL scriptsSummary: Content (please ensure you mask any confidential information): Version (include the version you are using, if applicable): Code Snippet (add any code snippets t…
-
Project driven Manufacturing and Sales OrdeHi We have a scenario of Project Driven SCM wherein the manufacturing will happen with project details. And the manufactured item will be shipped to customer using Sales…
-
When I generate a work order, I get the following error message The parameter passed to the API wasSummary: When I want to save the work order, that's when I get that error. Content (please ensure you mask any confidential information): Version (include the version yo…
-
How to create automatic Alternate Work Definition with reference Alternate BOMSummary: How to create automatic Alternate Work Definition with reference Alternate BOM Content (please ensure you mask any confidential information): Hi Team, We have p…
-
Manufacturing decomission processHi, I have doubts about how to handle the decommissioning of manufactured products(FG) in Discrete Manufacturing Example: I'm a manufacturer of Miltant Transmission(FG) …
-
Required Privilege to get manufacturing work ordersWe are customizing a label printing solution in which we are printing the labels by getting work orders. For the particular user, we want that user should only be able t…
-
Assignment priority in Material Availability AssignmentWhat is functionality of the field 'Assignment priority' in Material Availability assignment. How this numeral value is calculated. Can we control this value through any…
-
Change Work Definition date based on Work Order Start date on Released Work OrdersSummary: We have a requirement to change the Work Definition date on a Released Work Order so that the latest Work definition version corresponding to the latest item re…
-
How do I report production in secondary UOM (unit of measure) via REST APISummary: We have a use case where we want to report production via REST API using only an item's configured, secondary UOM relying on the configured conversion factor to…
-
Configurator with process manufacturingDoes Configurator work with process manufacturing?
-
After a work order is completed, how can I query the data of the sales order and wo order details?Summary: I need SO details and WO details after completing the WO, which the direct link will be removed. And is that query available in BICC PVO? Content (please ensure…
-
Is there any report for outside processing work orders?Summary: Are there any out-of-box reports for information on outside processing work orders? Content (please ensure you mask any confidential information): Need a report…
-
How to transform an item from revision A to revision B?Summary: Business scenario - A Work Order is in progress for item revision A with lots of materials issued and operations completed. Meanwhile an item revision B is crea…