Production Execution
Discussion List
-
Does Oracle Mfg cloud support work order creation for ATO Standard finished product with std BOM?Summary: There is an ask to create work order from sales order for standard finished product without enabling back to back feature. So, want to define an ATO standard it…
-
Does Transform Work order eligible for Process manufacturing?Summary: Content (please ensure you mask any confidential information): I Created Transform Work Order for process manufacturing and it seems fins, however i can see in …
-
Need to know how can to set up our orchestration processes for MFG of processSummary: Can someone help me understand how to configure orchestration processes for a manufacturing process where I need to produce a finished product but first I need …
-
Material issued at one rev, Returned at another.Summary Material was issued in older revision and wen we returned the material it by default took the current effective revisionContent The Situation is we had on hand s…
-
How do I load Work Definition attachments thru FBDISummary: We are in SIT phase and have Work definition attachments in our legacy system. These attachments are in the header level as well as in the operation level. Howe…
-
Add dff in Work Execution Inventory trainstopAdd dff in Work Execution Inventory trainstop. How to add a field in Additional information dialog box at the Inventory trainstop of Operation transaction? 23C
-
Mass Product Completion transaction for lot enabled item in Process Work Order using Visual BuilderSummary: Dear Experts, We have a requirement where we need to complete more than 100 lots in a process manufacturing work order. Each lot contains 1 quantity. Thus, we n…
-
How to reduce the transfer order process in manufacturing plantsDear All, If an item is completed by the production department, it must go smoothly to the second stage to the other production department. Currently, we are doing this …
-
Outside processing for semi-finished and finished goodSummary: How to manage outside processing when a finished good is manufactured in two steps in two distinct work orders? Content (required): Our customer would like to s…
-
Is it possible to record the Production Operator's Working Shift when completing the Production?Summary: We have a requirement that when the Production is started/completed from Review Dispatch List, Production Operator wants to record his working shift. But the Bu…
-
Assembly DismantleSummary: Content (required): Hello Friends User is creating a Finished Goods (FG) by using 5 different components. Once Finished Goods comes to inventory, inspector reje…
-
Unable to Disassociate serial number of serial status completed from work orderSummary: In fusion manufacturing, we have work orders for serial tracked manufacturing. Under serial number tab serial number has been generated, material issued, and op…
-
How to return unused items to inventory that are purchased from a work orderSummary: We want to know if there's a way in which the items that are purchased from work order in work order destination can be returned to inventory Content (required)…
-
Incorrect unit of measure for a componentSummary: Hi We have created an item with incorrect unit of measure. And this item is a component in the structure of a Finished item and used already in many work orders…
-
What should be consideration for creation of Work Order and Work Center in a Plant?Summary: Dear Experts, What all points we should consider before identifying and creating Work Area and Work Center in a Process Manufacturing Plant? 1) What should be t…
-
Discrete Manufacturing Setup and transaction documentSummary: Kindly provide the Discrete Manufacturing Setup and transaction flow white paper document/user manual document. Content (required): Oracle Fusion Cloud Applicat…
-
How to handle making the same item number in two mfg IOs with different costs?Summary: A company wants to be making the same item number in two mfg IOs and then wants to transfer the items to a single distribution IO. Content (required): A company…
-
There is no restriction on work order validity i.e completion dateSummary: There is no restriction on work order validity, once work order completion date is achieved system should not allow further work order transaction to happen for…
-
How to automatically backflush Assembly pull components through Rest API for orderless transactionsSummary: How to automatically backflush for Assembly pull components through Rest API? Content (required): We have a requirement where we have non-lot-controlled compone…
-
Report Material Transaction on Work order needs to restrict users within a specific toleranceSummary: Report Material Transaction on Work order needs to restrict users within a specific tolerance Content (required): There is a need to restrict the shopfloor user…
-
Not able to see substitute item option on discrete manufacturing work orderSummary: Hi, I'm not able to see substitute option on discrete manufacturing work order. Content (required): Hi, I've defined a substitute item on item structure and sam…
-
BOM modification in PIM, the WD should update itself automatically.Summary: In the WD, there is the BOM, when we have a BOM modification in PIM, the WD should update itself automatically. Content (required): Version (include the version…
-
We would like to update Lot status for orderless completions through REST APISummary: We would like to update Lot status for orderless completions through REST API Content (required): We have a scenario while performing orderless completions for …
-
Unable to bulk assign pre assigned serial numbers during work order completionSummary: steps performed: 1. item with lot attribute as dynamically generate and serial number as preassigned. 2. generate preassigned serial numbers 3. use the item for…
-
Can we reopen a closed work order when the costing period is still open?Summary: Due to some issues on the planning , we had duplicate work orders generated in the system. Users from shop floor have completed without realizing it and compone…
-
How to provide Lot DFF's during work orderless completion while entering completion LotsSummary: We have created Descriptive flexfields in "Maintain Lot Numbers" flexfield but while we are performing work orderless completions we are unable to find Lot DFF'…SK Kousar Sulthana 22 views 2 comments 0 points Most recent by Prasanth Senthivel-Oracle Manufacturing
-
Can I use a phantom item that lists both output and input items in a process work definition?Summary: Use a phantom item that lists both output and input items in a process work definition Content (required): Use case: client needs to define multiple output prod…
-
What is the logic to update Due date at WO in Reservation window?Hello Team , We are trying to update the SSD and RSD (Request Shipped date) at sales order, and we are expecting to make the changes in back-to-back WO Due date in reser…
-
Why system allows material transactions even after work order is marked as undercomplete?Summary: We are using process manufacturing. Marked a work order as 'undercomplete', Work Order status changed to 'Complete' but still Work Order is appearing in review …Uma Shankar Kumar 22 views 5 comments 0 points Most recent by Prasanth Senthivel-Oracle Manufacturing
-
What is significance of 'Start or Stop Operation' button at Review Dispatch List page.Summary: What is significance of 'Start or Stop Operation' button at Review Dispatch List page. Is it only indicative or does it also capture real execution time of an o…Uma Shankar Kumar 23 views 2 comments 0 points Most recent by Prasanth Senthivel-Oracle Manufacturing