Production Scheduling
Discussion List
-
How to round off work order quantity when WO is created from Planning?Summary: Hi, One of the customer is using Oracle Supply Planning and WO gets created in Oracle Manufacturing Cloud after releasing planned order. We are using Shrinkage …
-
Create Resource Exception - Available only on Wednesdays and FridaysSummary: Create Resource Exception We need to create a resource exemption for a machine that should be available only on Wednesdays and Fridays for the next 12 months. H…
-
Calculate Lead time and Roll up Cumulative lead time-Processing ErrorSummary: We are facing this issue when we run the "Calculate Lead time and Roll up Cumulative Lead time" Program. This is error - The lead time calculation was not perfo…
-
Production Scheduling- Delay between operations within same work orderSummary: Hi, We have a requirement where the customer wants a delay of 2 hours between operations within the same work order. Ideally, we have delay between operations a…
-
Production scheduling not prioritizing changeover duration.Summary: Hi Team, We are preparing for a demo on PS for a client. The ask is to group all work orders by similar types of ice cream, and production scheduling should seq…C.Upadhyay 28 views 2 comments 0 points Most recent by Parag Dabre-276222 Supply Chain Planning and Collaboration
-
Scheduling Method in Work OrderWe can see the Scheduling method as 'Default Scheduling' when a Work Order is created (UI or released from Planning) When we update the Work Order in Production Scheduli…
-
Work Order overlap in Production SchedulingWe are using the Oracle Fusion Supply Planning and Production Scheduling. Our requirement is as below: Assume all work orders need 20 minutes to complete. As of now, pro…
-
Ability to assign operations to technicians (Resource)Summary: Is there a feature in Manufacturing Cloud that allows for assigning technicians to specific operations, enabling them to review and execute the operations assig…
-
Production Scheduling takes alternate resource instead of Primary resourceSummary: HI, We have two resource- One Primary resource A and alternate Resource B. Only if the Primary resource is not available the alternate resource needs to be cons…MMA27305 51 views 3 comments 1 point Most recent by Suprakash2 Rath Supply Chain Planning and Collaboration
-
How is work order need by date calculatedSummary: How is work order need by date calculated? Since this field is not available in the UI, we would like to understand how the data is getting calculated in the ba…
-
can primary resource be defined as alternate resource as well in other work defn./std. operation?Summary: Can we configure the primary resource in one work-definition/operation as alternate in another work-definition/operation? Will Supply Planning (Constrained) and…
-
How to create manufacturing calendar which can be used in manufacturing and GOPTeam, When I assign plant with 5 days calendar, I am unable to see the plant in GOP while creating sourcing rule. Reason being, for collection of calendar, the calendar …
-
Work Order creation not allowed in Contract Manufacturing Orgunable to create work order in contract manufacturing org all field disabled, do have Manufacturing Engineer Role and data access
-
Attachment flow from Item Strucuture to WorkDefination and to WorkorderSummary: Hi Manufacturing Guru's We have a requirement of Attaching Engineering Drawings at Item structure; these attachments need to flow to Work Definition where the I…
-
any mobile app for doing WIP transactions on Oracle fusion cloudIs there any mobile app for doing WIP transactions on Oracle fusion cloud. Also can you please let us know how to download those steps?
-
Work Definition Updates for Released Work Orders with Open OperationsSummary: Is there an option to pull the most updated version of the work definition for a work order that is in Released status and has an open operation? The work order…
-
Manufacturing decomission processHi, I have doubts about how to handle the decommissioning of manufactured products(FG) in Discrete Manufacturing Example: I'm a manufacturer of Miltant Transmission(FG) …
-
How to automate creation of a new work order when batch number of any of the materials exhaust?Summary: Our client is into healthcare and life sciences, and its very critical we track and maintain the batch numbers of the raw materials that are used in production.…
-
need to make work order scheduling to be maintained to match the following caseSummary: If we produce 1 quantity of Product X, which takes 1 labor unit and 3 hours of required usage, the lead time for this 1 quantity will be 3 hours. However, if we…
-
Manufacturing Lead time issueSummary: Manufacturing Lead time not correct when resource is available in one of the shifts out of multiple shifts. Content (please ensure you mask any confidential inf…
-
Calculate Material Availability Program is taking a long time to runSummary: Calculate Material Availability Program is taking a long time to run. It sometimes takes up to 7 minutes to run and blocking other programs. It is also showing …
-
How to change production priority in work order based on reservationSummary: Consider, in manufacturing unit, work order will be prioritised based on the reservations. For eg, In a work order - reservation scenario, if Reservation flag -…Shyam Ganesh Parthasarathi-Oracle 11 views 2 comments 0 points Most recent by Raj C -Oracle Manufacturing
-
Basis Type to be defaulted as Fixed based on specific item in work definitionSummary: Hi in a work definition, whenever we add items as input items, the basis type is defaulted as Variable. But there as some items which are dies used in business …
-
Why inactive items are available (appearing still) to be added in the work definitions ?Item has been made inactive by users as they don't want to use it any more. But in the work definition, in the process of adding input items, we could still see the inac…
-
Is Planning Central bundled together with Manufacturing Cloud?Summary: Without licensing supply planning cloud, can we use planning central and is planning central bundled with Manufacturing or any Supply Chain Execution module. My…
-
How to change an existing operation code to another Operation code in a process work definitionSummary: What are the correct steps to be followed if we want to change an operation code to an another operation code through FBDI. Currently this operation also has so…
-
takt time calculationSummary: Hello All, One of my customer wants to see visualization of Takt time with a countdown clock for technicians logged into the order; multiple technicians may be …Vishnuvarth Subramanian-Oracle 11 views 2 comments 0 points Most recent by Elaine Wan-Oracle Manufacturing
-
Is there any way to check the work order start and completion date changes done on the work order .Summary: There has been many revisions that are seen in OSP Purchase order that are seen triggered automatically. To check this we want to see if there are any date chan…P.S.Nikhitha Muduliar 11 views 3 comments 0 points Most recent by Prasanth Senthivel-Oracle Manufacturing
-
Which areas are affected when time zone is changed in the Manage Inventory Organization parametersWhich areas in the oracle fusion cloud are affected when time zone is changed in the Manage Inventory Organization parameters
-
How to select alternate resources from WD while completing orderless completionSummary: Is there any way to select alternate resources in "Report orderless completions" task where we have multiple alternate resources in single work definition Conte…