Production Scheduling
Discussion List
-
How to enable help for crearting transactionSummary: Hi, How can I enable the Help menu in Redwood UX when creating transactions such as work orders, purchase requisitions (PR), or purchase orders (PO)? In the cla…
-
In B2B Make process, changing the Completion Date in WO also changes the Scheduled Ship Date in SOSummary: Hi Experts, We are facing an issue in the Back to Back business flow, when the Work Order Completion Date gets changed, the system automatically updates the Sch…
-
Anchor Date in Production SchedulingSummary: Hello Team, May I know the purpose and best practice of using Anchor start date and time?. By reading Oracle documents it is understood that Anchor date is used…
-
Requirement to Over-Complete Later Operations Due to Yield Determination at a Later StageSummary: We have a requirement where we need to allow over-completion of later operations in discrete manufacturing, as the initial operation steps primarily involve pre…
-
Is it possible to set the Work Order Transaction Date to the past date specified during PO receipt?When receiving the Purchase Order for Outside Process, we specified a past Receipt Date. However, the Transaction Date of the Work Order's Operation Transaction becomes …
-
How to handle overlapping shifts in Oracle calendarsSummary: How to handle overlapping shifts in Oracle calendars Content (please ensure you mask any confidential information): Version (include the version you are using, …
-
Can we create sequence dependency in Oracle Cloud process manufacturing?Summary: In EBS we have the capability to assign sequence dependencies which can be used in ASCP for manufacturing planning. Can we setup something similar in Cloud Proc…
-
Scheduling Method in Work OrderWe can see the Scheduling method as 'Default Scheduling' when a Work Order is created (UI or released from Planning) When we update the Work Order in Production Scheduli…
-
Operation Setup time- Work definitionSummary: We have a requirement to define Machine and Labor setup time to be defined as part of each operation in work definition The intent is to use this time for the p…
-
Need clarification on a Proactive SR for Resource assignment to shifts or make it available 24HrsSummary: A Proactive SR was raised for "Impacting the work order scheduling if the work center resource is not assigned to any shift or not available 24 hours". Need to …Prince_Choudhary 11 views 2 comments 0 points Most recent by Prasanth Senthivel-Oracle Manufacturing
-
How to change the work order status when it is rescheduled from production schedulingSummary: How to change the work order (WO) status when it is rescheduled from production scheduling Content (please ensure you mask any confidential information): In our…
-
Mass Edit Work Orders- Production Scheduling 25A FeatureSummary: Hi Team, We have this new 25A feature in Production Scheduling "Mass Edit Work Orders" where we have the ability to mass edit certain attributes in the work ord…MMA27305 41 views 5 comments 0 points Most recent by M. Bolsinger-Oracle Supply Chain Planning and Collaboration
-
How to change the default scheduling method in manufacturing work orderSummary: How to change the default scheduling method in manufacturing work order. Current the Scheduling Method is showing "Default Scheduling" under Work order details …
-
Can a External System (Logility) generate a supply order for creation in SCO?Our client needs to send FG items to a contract manufacturer for additional operations, after which the items will be shipped directly to the customer. However, we are n…
-
How to calculate resource availability and utilization for ManufacturingHi Many work orders have not been processed through planning, and I would like to calculate the resources utilized over the past few years. I am looking for data related…
-
Manufacturing at supplierSummary: We have the below requirement wherein we need to procure a raw material (Item A) from a supplier (SUP1) and send it to another supplier (SUP2) who will use that…
-
How to consider operation duration when it is short but has to be done early in a work orderSummary: Define the right duration for an operation that has to be early in the work order Content (please ensure you mask any confidential information): Our customer ha…
-
Update Process Work Order Header "Context segment DFF" by Visual builderSummary: Update Work Order Header "Context sensitive segments DFF" by Visual builder Content (please ensure you mask any confidential information): In our manufacturing …
-
Production scheduling not prioritizing changeover duration.Summary: Hi Team, We are preparing for a demo on PS for a client. The ask is to group all work orders by similar types of ice cream, and production scheduling should seq…C.Upadhyay 31 views 3 comments 0 points Most recent by Ramesh Choudhary Supply Chain Planning and Collaboration
-
How to round off work order quantity when WO is created from Planning?Summary: Hi, One of the customer is using Oracle Supply Planning and WO gets created in Oracle Manufacturing Cloud after releasing planned order. We are using Shrinkage …
-
Create Resource Exception - Available only on Wednesdays and FridaysSummary: Create Resource Exception We need to create a resource exemption for a machine that should be available only on Wednesdays and Fridays for the next 12 months. H…
-
Calculate Lead time and Roll up Cumulative lead time-Processing ErrorSummary: We are facing this issue when we run the "Calculate Lead time and Roll up Cumulative Lead time" Program. This is error - The lead time calculation was not perfo…
-
Production Scheduling- Delay between operations within same work orderSummary: Hi, We have a requirement where the customer wants a delay of 2 hours between operations within the same work order. Ideally, we have delay between operations a…
-
Work Order overlap in Production SchedulingWe are using the Oracle Fusion Supply Planning and Production Scheduling. Our requirement is as below: Assume all work orders need 20 minutes to complete. As of now, pro…
-
Ability to assign operations to technicians (Resource)Summary: Is there a feature in Manufacturing Cloud that allows for assigning technicians to specific operations, enabling them to review and execute the operations assig…
-
Production Scheduling takes alternate resource instead of Primary resourceSummary: HI, We have two resource- One Primary resource A and alternate Resource B. Only if the Primary resource is not available the alternate resource needs to be cons…MMA27305 51 views 3 comments 1 point Most recent by Suprakash2 Rath Supply Chain Planning and Collaboration
-
How is work order need by date calculatedSummary: How is work order need by date calculated? Since this field is not available in the UI, we would like to understand how the data is getting calculated in the ba…
-
can primary resource be defined as alternate resource as well in other work defn./std. operation?Summary: Can we configure the primary resource in one work-definition/operation as alternate in another work-definition/operation? Will Supply Planning (Constrained) and…
-
How to create manufacturing calendar which can be used in manufacturing and GOPTeam, When I assign plant with 5 days calendar, I am unable to see the plant in GOP while creating sourcing rule. Reason being, for collection of calendar, the calendar …
-
Work Order creation not allowed in Contract Manufacturing Orgunable to create work order in contract manufacturing org all field disabled, do have Manufacturing Engineer Role and data access